Trailer #1

  • Requires at least 5 people for labor
  • All access points to bottling site need to be cleared of any low hanging branches and provide a minimum of 10' foot wide clearance.

Trailer #2

  • Requires 6-7 people for labor depending whether capsule application is required
  • All access points to bottling site need to be cleared of any low hanging branches and provide a minimum of 10' foot wide clearance.